RRCC 26-01-IFB01C

Replace/Upgrade Emergency Generator, Lakewood Campus
Project No: 2024-082M23

Project Description:

Red Rocks Community College (RRCC) Lakewood Campus, Main Building. The scope includes a new standby generator to be installed to serve the data center and additional loads. A new transfer switch and a new distribution panel, HPG, is also to be installed to serve all loads on the generator. Refer to demo and new one-line diagram for refeeding the new distribution panel. A significant shutdown of the existing switchboards will be necessary and need to be coordinated.
Basis of design is a CAT Natural Gas Generator DG350. See attached cutsheet.

Information For Bidders
20251117 RRCC Generator IFC Combined Specs
Bid Set Combined
Advertisement to Bid

RRCC 25-01-IFB01C

Replace East Wing Roof, Lakewood Campus, Phase 2 of 2
Project No: 2023-084M22

80841190_Addendum-1-for-Phase-2-Roof.pdf

Project Description:

a. This project includes the removal of existing roof systems and associated flashings for in-scope roof replacement areas. The Contractor will be required to furnish and install a new fully adhered black EPDM membrane roof assembly system at all roof replacement areas. All work will include new flashings and new sheet metal (fascia metal, parapet cap, counter-flashings, roof jacks, etc.) as shown per roof deck assembly on the drawings.

b. All work noted above to be performed as specified in accordance with the design drawings, specifications, and governing building codes.

East Wing Roof Phase 2 drawings bid set
East Wing Roof Phase 2 specs bid set
Information for Bidders
Advertisement to Bid
Supplementary General Conditions

Construction Project Contacts

Lynn Beltran - Director of Purchasing - lynn.beltran@rrcc.edu

Mark Bana - Facilities Directormark.bana@rrcc.edu - 303.914.6220

Claire Dean - Program Assistant claire.dean@rrcc.edu - 303.914.6393