Current & Past Projects

RRCC 26-16-IFB01

Main Entry Courtyard Renovation, Lakewood Campus
Project No: C25C0030

Project Description: 

Renovation of Lakewood Campus Main Entry Courtyard.

RRCC 26-15-RFQ01

Nursing & Health Imaging Building, Arvada Campus
Project No: C26C0035

Project Description: 

Project consists of constructing a new approximately 28,000 GSF Nursing Education Building located within the FRH development area in Wheat Ridge, Colorado, with targeted occupancy in Fall 2027. The building will support instructional and program functions and will require coordination across site development, utilities, and subdivision infrastructure.

RRCC 26-09-IFB01C

Upgrade West End Rooftop Unit, Lakewood Campus
Project No: 2025-111M24

Project Description: 

Red Rocks Community College (RRCC) Lakewood Campus, West End. The Project consists of the removal and replacement of six, (6) natural gas-fired, DX cooling rooftop units on the roof of the Fire Science Building. The rooftop unit designations for this work are as follows RTU-1, RTU-2, RTU-3, RTU-4, RTU-7 and RTU-8. Work consists of disconnecting and reconnect existing electrical feeds and natural gas. Integrate the rooftops to the existing Campus building automation systems.

An alternate price shall be received for RTU-5 and RTU-6.

RRCC 26-08-IFB01C

Replace/Upgrade Emergency Generator, Lakewood Campus
Project No: 2024-082M23

Project Description:

Red Rocks Community College (RRCC) Lakewood Campus, Main Building. The scope includes a new standby generator to be installed to serve the data center and additional loads. A new transfer switch and a new distribution panel, HPG, is also to be installed to serve all loads on the generator. Refer to demo and new one-line diagram for refeeding the new distribution panel. A significant shutdown of the existing switchboards will be necessary and need to be coordinated.
Basis of design is a CAT Natural Gas Generator DG350. See attached cutsheet.

RRCC 25-01-IFB01C

Replace East Wing Roof, Lakewood Campus, Phase 2 of 2
Project No: 2023-084M22

80841190_Addendum-1-for-Phase-2-Roof.pdf

Project Description:

a. This project includes the removal of existing roof systems and associated flashings for in-scope roof replacement areas. The Contractor will be required to furnish and install a new fully adhered black EPDM membrane roof assembly system at all roof replacement areas. All work will include new flashings and new sheet metal (fascia metal, parapet cap, counter-flashings, roof jacks, etc.) as shown per roof deck assembly on the drawings.

b. All work noted above to be performed as specified in accordance with the design drawings, specifications, and governing building codes.

  • East Wing Roof Phase 2 drawings bid set
  • East Wing Roof Phase 2 specs bid set
  • Information for Bidders
  • Advertisement to Bid
  • Supplementary General Conditions
Construction Project Contacts

Lynn Beltran - Director of Purchasing - lynn.beltran@rrcc.edu

Mark Bana - Facilities Directormark.bana@rrcc.edu - 303-914-6220

Claire Dean - Program Assistant claire.dean@rrcc.edu - 303-914-6393